Warning: Declaration of ET_WC_Product_Variable_TB_Placeholder::get_available_variations() should be compatible with WC_Product_Variable::get_available_variations($return = 'array') in /home/tirnan5/public_html/wp-content/themes/Divi/includes/builder/module/helpers/WooCommerceModules.php on line 837
The 2019 31 Day Blog Writing Challenge – Day 22 | Tír na nÓg Studio

UFO progress

Today I reloaded a quilt on the frame which I had started to quilt in 2017 and had to come off as I misjudged the alignment of the quilting and had to un-sew a whole row of quilting.

It has been folded under the long arm machine for such a long time it was has been calling for me to put it back on the frame  so today I took the plunge and began that process.

Here it is on the design wall from when I lived on Ballad Court in 2017:

and here it is today as I made progress on the quilting:

I got 2 more rows quilted and just over half way done and hope to have the rest done over the next few days and will post a picture when it is done. It will then move to the binding UFO pile.

 

Pin It on Pinterest

Share This